We were asked by Warwickshire County Council to fully re furbish the existing school pool at Kineton. The existing surface was painted and had to be re painted twice over the last two years, therefore we were approached and asked about alternatives. After a few meetings and discussions we suggested the pool was grit blasted (as per the picture) so that all the paint was removed and ready for other repairs and ready for tiling.

Along with the tiling, all the existing skimmers had to be dug out and replaced with new and the existing handrail was removed, refurbished and re-fixed using new stainless steel brackets and fixings.

 

Here is a recently completed contract

Tiling in progress

 

The arduous task of tiling the deep end walls and beginning the cleaning in readiness for the new grouting material. Preparing and laying out is of paramount importance so that the tiling is neat and tidy. 

Applying the new epoxy grout and washing off

pool grouting
pool grouting



Once the newly fixed tiles are set, the next process is to apply and wash off the epoxy material.

Fully tiled Pool

completed pool
completed pool



Completed swimming pool fully tiled

Complete

completed
completed


As you can see, now the pool is almost tiled completely the final cuts are about to be fixed.